Construction to Begin on Waterway Village Pedestrian Bridge in Gulf Shores

OBA Staff • February 28, 2025

Traffic Pattern Changes Begin March 10th (see map below)

Waterway Village Pedestrian Bridge

Gulf Shores, Ala. – (OBA) – The City of Gulf Shores announced today that construction will soon begin on the Waterway Village Pedestrian Bridge. The project is part of the Highway 59 Expansion and is aimed at enhancing pedestrian safety and connectivity.


The new pedestrian bridge is essential because the expansion project will add a third southbound lane, eliminating pedestrian access across the Intracoastal Waterway via the W.C. Holmes Bridge. The dedicated pedestrian crossing will ensure safe access for residents and visitors.


Traffic Changes Starting March 10:

On March 10, a new traffic pattern will take effect. Access to East 2nd Street from Canal Road (Highway 180) will be permanently closed. Motorists will need to use East 3rd Street and East 22nd Avenue to reach Highway 180. Additional access points will be available at East 24th and East 23rd Avenues.


New traffic signals at East 24th Avenue/East 3rd Street and East 22nd Avenue/East 2nd Street are currently in flash mode and will become fully operational the week of March 3. A new stop sign will also be installed at East 3rd Street and East Canal Road.


Bridge Design and Connectivity:

The pedestrian bridge will rise 75 feet above the water to meet U.S. Army Corps of Engineers requirements. It will feature twin towers with large-capacity elevators and approximately 144 stairs on each side. Plaza developments and streetscape improvements are also planned.


Once completed, the bridge will provide seamless pedestrian connectivity from the beach to Cotton Creek Drive, making the area more walkable and accessible for both residents and visitors.


Supporting Community Growth:

The pedestrian bridge plays a crucial role in the city’s vision for developing The Waterway as Gulf Shores' "second coast." New plaza developments will create community gathering spaces and additional parking on East 2nd Street. This will support local businesses by improving accessibility to shops and restaurants.


"This bridge is more than just a crossing. It’s a cornerstone for our vision of The Waterway Village District," said Mayor Robert Craft. "We are building a dynamic hub that connects our existing attractions with new community spaces, creating opportunities for growth."


Funding and Completion Timeline:

The project is funded by the general fund and the BUILD Grant, managed by the Federal Transportation Administration. Construction is scheduled for completion in Winter 2026.


Traffic Pattern Changes in Gulf Shores

Share this article w/ Friends...

Ivan and Sally Remind Gulf Coast Residents of Storms’ Lasting Power
By R. Ken Cooper September 16, 2025
Orange Beach, Ala. — (OBA) — Two major hurricanes, sixteen years apart, struck the Alabama Gulf Coast on the same date and left Orange Beach reeling in their aftermath. The first came when Hurricane Ivan roared ashore in 2004 on the Alabama Gulf Coast as a powerful Category 3 storm. With peak winds of around 120 miles
Alabama Gulf Coast Zoo Expands Education Efforts with Cub Club Program
By OBA Staff September 16, 2025
Gulf Shores, Ala. — (OBA) — The Alabama Gulf Coast Zoo is preparing to welcome its youngest visitors into a new hands-on learning experience. Starting this fall, the zoo will launch “Cub Club,” a program designed specifically for preschoolers and their families. The initiative blends playful activities with...
Orange Beach City Hall
By John Mullen September 16, 2025
Orange Beach, Ala. – (OBA) – Orange Beach is currently looking at design proposals for a new civic center planned for the south side of Canal Road. It would be across the street from the Senior Center, library, Coastal Arts Center and Waterfront Park. In the evaluation process, SS&L scored a 92, and McCollough...
Lion King Cast at the Performing Arts Center in Orange Beach
By OBA Staff September 16, 2025
Orange Beach, Ala. — (OBA) — Disney’s beloved tale “The Lion King, Jr.” will take the stage in Orange Beach this October, bringing colorful characters and timeless music to life. The production will be performed at the Orange Beach Performing Arts Center and is expected to draw families and theater fans from across...
Witches on Wheels Returns to Gulf Shores with Haunted Hustle
By OBA Staff September 16, 2025
Gulf Shores, Ala. — (OBA) — Gulf Shores is preparing for a fall celebration that blends Halloween spirit with community fitness. The Witches on Wheels Bicycle Parade will return to Gulf Place, bringing together riders in costume and decorated bikes for a lighthearted parade by the beach. The event is part of the...
Foley City Hall
By John Mullen September 15, 2025
Foley, Ala. – (OBA) – Foley is looking at design costs for renovations and a rebuild project for Leisure Service Parks and Horticulture. Parts of the plan for 102 E. Orchid Avenue include an interior renovation to the current public works building. A second part calls for the current office to be replaced with a...
Things to do on the Gulf Coast this week
By Jessica A. Taylor September 15, 2025
Orange Beach, Ala. — (OBA) — This week, the Gulf Coast offers a diverse range of activities and events focused on art, culture, culinary experiences, music, and community engagement. At the Coastal Art Center, visitors can immerse themselves in creative expressions and artistic exhibitions. Additionally, a business...
Gulf Shores City Hall
By John Mullen September 15, 2025
Gulf Shores, Ala. – (OBA) – Changes in the plans for widening work on State Route 59 from Cypress Bend Drive and County Road 6 will cost Gulf Shores an extra $118,213. The city will pay Volkert for the changes to remove plans for improvements at the State Route 59 and County Road 6 intersection. Added expenses made...
Alabama Waters to Open for Oyster Harvest in October
By OBA Staff September 15, 2025
Orange Beach, Ala. — (OBA) — Alabama’s oyster harvest season is set to return, with state officials preparing for both commercial and recreational activity. The Alabama Department of Conservation and Natural Resources (ADCNR), through its Marine Resources Division, announced that public oyster bottoms will open to...
Riviera Utilities Earns National Recognition for Natural Gas Operations
By OBA Staff September 14, 2025
Foley, Ala. — (OBA) — Foley-based Riviera Utilities has been recognized once again for its strong record in operating a natural gas utility. The company received the System Operational Achievement Recognition, also known as SOAR, from the American Public Gas Association. Riviera was selected from hundreds of providers
Show More